Blog DSCN1039In 2007, the first person we contacted for assistance with designing our new conservation water system was UI water engineer David McClain. He took us on a field trip to view other UI installations and assisted in specifying a new system. Once we had a contract in place, he coordinated all the work with the vendor. As pieces were put into place, he patiently explained what each piece was for and how to use it. During the summer we worked several kinks out of the system.

Today, David came back and gave staff a session on how to use the system.